Design/Build P-147 Multi-Mission Maritime Aircraft Test Facility
Naval Air Station Patuxent River: Patuxent River, MD

The P-147 project involved the DOD AT/FP compliant design and construction of a state-of-the-art, environmentally efficient research/testing facility associated with the Navy’s prototype Poseidon Multi-Mission (P-8) aircraft development effort. All work was performed at the highly secure and occupied NAS Patuxent River installation, directly supported the P-8 development effort, and was critical to the program’s test-data analysis and research operations.

Work included the design and construction of extensive flexible office and operations areas, conference rooms, bathrooms, entrance/reception and storage areas, mechanical and communications rooms, stairwells, and ADA compliant handicapped access areas, as well as the installation of advanced life safety systems, including fire protection and mass notification units, and of multiple reinforced secure areas designed to store secured and classified information and equipment.

The project also featured advanced electrical, plumbing, sprinkler/alarm, and mechanical and HVAC systems, including state-of-the-art energy conservation controls, a large roof-top HVAC unit, and associated heating and cooling equipment, as well as the installation of mission-critical fiber-optic and additional communications lines and systems (each integrated with the P-8 program’s adjacent hangar operations).

Additional design/build-related work involved exterior site analyses, including site surveys and geotechnical reports, comprehensive interior and exterior architectural finish work and interior design plans, roofing systems development, space planning and furniture and equipment layout, post-analyses site work, including excavation, demolition, parking lot development, landscaping, perimeter security features, and civil site utilities design, including electrical expansion lines and utility protection.

The facility is a critical component in the prototype P-8 aircraft development schedule and, as such, delivery by the contract completion date was also critical (only 365 days were allotted for design and construction). Consequently, Grimberg developed a comprehensive fast-track schedule and phasing plan that included aggressive trade coordination and enforced strict timeline compliance requirements. This efficient work plan ensured that all milestones were achieved on or ahead of schedule, that all owner-requested upgrades were seamlessly incorporated into the work plan, and that the Navy’s delivery requirements were fulfilled without exception.

Grimberg’s scheduling and coordination effort provided the Navy with substantial additional value, including multiple time and cost-saving strategies. As a result, the company delivered a state-of-the-art facility on time, within budget, with no lost time accidents, and to the Navy’s total satisfaction.

As a result of the company’s performance, Grimberg received a 2007 Association of General Contractors Merit Award, as well as excellent overall project ratings.


OTHER MAJOR OPERATIONS AND RESEARCH FACILITY PROJECTS
  • GSA
    State Department Main Building
    Old State Infrastructure
  • GSA
    State Department Main Building
    Employee Services Center
  • ARMY
    Aberdeen Proving Ground
    Building 120 Renovation
  • NAVY
    Washington Navy Yard
    Building 101 Renovation
  • GSA
    National Archives
    Phase 1: Building Renovation
  • NAVY
    National Naval Medical Center
    USUHS Academic Program Center
  • GSA
    HOLC Building
    Chiller/HVAC Renovation
  • NAVY
    MCCDC - Quantico, VA
    Academic Instruction Building
  • ARMY
    National Imaging & Mapping Agency
    Renovation of the Fremont Building
  • ARMY
    National Defence University
    Renovation of Building 59
  • NAVY
    MCCDC - Quantico, VA
    BOQ Renovation - O'Bannon Hall
  • NAVY
    Washington Navy Yard
    Building 111 NCIS Renovation
  • NAVY
    National Naval Medical Center
    Repairs/Replacements (USUHS)
  • ARMY
    Walter Reed Army Medical Center
    Buildings 7, 54, & 512
  • FBI
    J. Edgar Hoover Building
    11th Floor Renovation
  • FBI
    J. Edgar Hoover Building
    Lab Decommissioning/Demolition
  • NAVY
    Naval Research Labratory
    Buildings 3, 12, & 30
  • ARMY
    Aberdeen Proving Ground
    Building 120 Renovation (Phases 1-3)
  • NAVY
    NSWC: Indian Head, MD
    Explosive Ordnance Disposal Facility
  • NAVY
    Naval Support Facility: Dahlgren, VA
    Weapons Dynamics R&D Center
  • ARMY
    Aberdeen Proving Ground
    CBR Sample Receipt Facility
  • ARMY
    Fort Detrick, MD
    USAMRIID Steam Sterilization Plant
  • NAVY
    NSWC: Indian Head, MD
    Agile Chemical Facility
  • NAVY
    Naval Support Facility: Dahlgren, VA
    Electromagnetic Research Facility
  • NAVY
    Naval Medical Center: Bethesda, MD
    USUHS Facility Renovations (1-10)
  • FBI
    Hoover Building: Washington DC
    Building Renovations IDIQ
  • DEA
    Justice & Training Center: Quantico, VA
    Clandestine Lab Training Center
  • DIA
    Bolling Air Force Base
    DIA Facility Renovations
  • ARMY
    Aberdeen Proving Ground
    Munitions Assessment Facility
  • NAVY
    Building 101 Renovation
    Washington Navy Yard
OTHER MAJOR DESIGN/BUILD PROJECTS
  • NAVY
    NSWC: Indian Head, MD
    Explosive Ordnance Disposal Facility
  • NAVY
    NSWC: Indian Head, MD
    Joint Counter IED Lab
  • NAVY
    Washington Navy Yard
    Building 101 Renovation
  • NAVY
    Naval Support Facility: Dahlgren, VA
    Electromagnetic Research Facility
  • NAVY
    Andrews Air Force Base
    ASA Facility Fighter Alert Complex
  • NAVY
    Naval Medical Center: Bethesda, MD
    USUHS Building 70 Renovations
  • NAVY
    Naval Support Facility: Dahlgren, VA
    Weapons Dynamics R & D Center
  • NAVY
    NSWC: Indian Head, MD
    Water System Improvements/Plant
  • DIA
    Bolling Air Force Base
    DIA Facility Renovations
  • ARMY
    NIMA: Bethesda, MD
    Renovation of the Fremont Building
  • NAVY
    USNA: Annapolis, MD
    HTHW Piping
  • ARMY
    Fort Meade, MD
    Building 2253 Renovation
  • GSA
    Washington DC
    HOLC Building Renovation
  • USPS
    Gaithersburg, MD
    Facility HVAC/Electrical Upgrade
  • GSA
    Washington DC
    Liberty Loan Building Renovations
  • GSA
    Cohen Building: Washington DC
    Stairwell Renovations
  • FBI
    Hoover Building: Washington DC
    11th Floor Renovation
  • NAVY
    Quantico, VA
    SNCO Academic Facility
  • GSA
    HUD & Commerce Buildings: DC
    Chiller/HVAC Renovations