Clandestine Laboratory, Training and Research Center, Department of Justice DEA, in Quantico, Virginia
A General Contractor Serving Washington, DC Metropolitan Area Since 1951

BID SCHEDULE AS OF THURSDAY 5/1/2025

Bid Date Project Location Estimate
5/15/2025 Construct Vehicle Barriers at PS7, VIF N/S, Cx 41, Kennedy Space Center, FL KSCC 18-1525, Canaveral Air Station, Patrick Space Force Base, FL 32925 $500,000-1 Million
10:00A US Air Force Space System Command (FA252125B0005 Amnd. 3) ConstructConnect:
This acquisition is for a firm-fixed-price construction contract for the contractor to provide all materials, labor, and equipment to provide antiterrorism barriers at the VIF N/S, Complex 14, and Pump Station 7 via bollards and cable fence barriers. Work will include providing foundation and steel design for the bollards and cable fence barriers which will be located on or near roadways and railways.
6/2/2025 Huntsville MRR VII MATOC D/B Renovate Patient Movement Items (PMI) Warehouse, Phase 2 Malcolm Grow Medical Clinic, Building 3417, 779th Medical Group, Joint Base Andrews, MD $1-5 Million
11:00A Dept of the Army Huntsville District (MRR-2025-002508 Amnd. 1) ConstructConnect:
The intent of this project is to renovate the interior/exterior of Bldg. 3417 to meet the PMI mission requirements and relocate the existing PMI operations from Bldg 1054 to Bldg 3417. The renovation shall meet all current codes, regulations, and standards, including Joint Base Andrews Design and Construction Guidelines. the Government is open and willing to consider "innovative" solutions that meet current UFC guidelines.
6/23/2025 AOC MACC 2020 Roof Repairs and Improvements, PCAVC 19053 Mount Pony Road, Culpeper, VA 22701 $1 - $2 million
5:00P AOC (AOCACB25R0023 Amnd. 0) ConstructConnect:
General scope of work: Briefly and without force and effect upon the contract documents, the work of the Contract can be summarized as follows: 1. [The Work includes repair of the existing roofing system. Repairs will include work on the roofing membrane, expansion joints and parapets. 2. [The Work includes relocation and reestablishing the green roof soil and planting. 3. [The Work also requires limitations to equipment and weight distribution of relocated soil due to existing structural limitations.
NPS National Capital Region Construction MATOC Region 1 NCR of the National Park Service in Virginia, West Virginia, Maryland, and DC
Dept of the Interior, NPS (140P3023R0006 Amnd. 0) ConstructConnect:
Location for all services under this MATOC will be in the Region 1 NCR in the National Capital Area of the National Park Service in the states of Virginia, West Virginia, Maryland, and the District of Columbia. PERIOD OF PERFORMANCE: The MATOC/IDIQ contract performance and subsequent Task Order (TO) ordering period will be two years from contract award. Three initial individual seed projects will be included in the solicitation and awarded as initial Task Orders (TO) from the MATOC contract. The estimated to total MATOC contract value is 49,999,000.00. The minimum and maximum values for a single task order are $2,000 and $5,000,000 respectively. The maximum value for all task order awards under awarded under the solicitation will not exceed $49,999,000.00 million over the life of the contract. The minimum guaranteed order for each contract is one (1) task order valued at $2,000. The overall ceiling amount for all contracts is $49,999,000.00 million. General construction services, to include but not be limited to: construction services to repair or rehabilitate historic and non-historic structures in addition to a minimum amount of new construction for project types inclusion of Site Utilities (water, sewer, gas, electric, communications), Site Improvements (trail, fence, grading, concrete work, landscaping), Water & Wastewater, Roadway (bike, roadway, signage, striping), Fire & Safety, Building exterior, Building interior, HVAC, Electrical, Plumbing (MEP), Sustainability (energy efficiency, renewables). The project examples are to include: renovations of historic and non-historic maintenance shops, visitor centers, fee stations, and other buildings; upgrades to electrical, water and sewer systems and facilities; rehabilitation and installation of fire suppression systems and safety systems; parking lot and road paving, HVAC replacement; roof replacement; and water, sewer and gas tank construction. Common trades which may be needed include carpentry, plumbing, electrical, general labor, general grading, mechanical, power equipment operations, heavy equipment, concrete work, asphalt and paving, roofing, painters, energy systems, renewable energy system, control systems, operation & maintenance work, remediation and abatement services, demolition services and/or any trades identified in the Construction Wage (Davis-Bacon) Determination and other trades common to the construction and service industries for facilities, infrastructure, roads and site work.
Albert V. Bryan Courthouse, Emerging & Sustainable Technologies (E&ST) Project Alexandria, VA 22314-5797 PreSolicitation posted 3/27/25 $15-20 Million
GSA (AP_P03_2025_0017 Amnd. 0) ConstructConnect:
1. Task 1: Chiller Plant Upgrades a. Base Bid: Replace chillers, chilled water pumps and isolation valves. Upgrade the chilled water side of the plant to a variable primary system type with properly sized pumps, bypasses, DDC controls, and accessories. Demolish glycol system and plate and frame secondary loop heat exchangers and associated pumps. c. Bid Alternate: Provide variable speed screw chillers instead of centrifugal magnetic bearing chillers. c. Bid Option: Replace condenser water pumps and associated valve trains. 2. Task 2: Lighting System Replacement: This will include existing lighting replacement with LEDs and a new full occupancy and daylighting controls system throughout the building, and new conduit and cabling where required. The building is 536k SF and has standard courthouse, administration, and building maintenance areas of use. The new system is targeted for a deep dive energy reduction of 40% using new settings according to the Energy Analysis Dept at Berkeley National Laboratory. a. Replacement and improvement of all interior building lighting systems. Includes demolition and installation of conduit and conductors for lighting. b. Bid Option: Replace garage and exterior lighting system. 3. Task 3: Controls Upgrades: A new secure BAS system that replaces the obsolete existing one and adds/replaces all end devices, air and water side controls on AHUs and VAVs, and other metering devices that increase the efficiency of the building. Devices include but are not limited to sensors for temperature, humidity, static pressure, carbon dioxide, differential pressure, airflow measurement, control valves, actuators, freezestat, etc. a. Base Bid: Provide upgraded non-proprietary native BACnet control components with proprietary Tridium Niagara Framework and front end (with native BACnet driver) control components. Provide control devices, programming, and graphics for the chilled water plant and AHUs 1 thru 20. b. Bid Option 1: Provide control devices, programming, and graphics for all fan powered terminal boxes. a. Bid Option 2: Provide control devices, programming, and graphics for lighting controls, RTUs and ACUs. b. Bid Option 3: Provide control devices, programming, and graphics for electrical panel metering and all exhaust/ventilation fans.
AOC MACC 2020 Modernization of Elevators at the US Capitol Police HQ and the Off-Site Facility US Capitol Police HQ and the Off-Site Facility $4-7 Million
AOC (1 Amnd. 0) ConstructConnect:
Replace in kind four (4) elevators, two (2) of these elevators are in USCP HQ Building, the other two (2) are at the Offsite Facility. Demolition and provision and installation of new four elevators as per construction documents drawings and specifications. • The scope includes the following CLINS: o CLIN 001 USCP Headquarters; o CLIN 002 Off-Site Facility (OSF) Based on previous studies, the two existing US Capitol Police headquarter elevators need to be renovated and the Code analyzed and thereby upgraded to meet current Code and standards, Two of the existing Off-Site Facility elevators are past their service life and need to be replaced to address safety, security and operation concerns. Scope of Work includes selection demolition of existing elevators as per construction documents, the work shall be performed at two sites. Currently, the construction documents are being updated to issue one consolidated IFC set.

Subs & Vendors

All projects are available in our plan room for review.
Fax your bid to 301-881-4938 or call 301-881-5120 for further information.

Let us know below which jobs you will quote: